7. Is exhaust ventilation testing desired for this evaluation? |
Note, If yes, an additional Exhaust Ventilation Testing Questionnaire may be required. |
8. Does this system use any radioactive materials or isotopes? |
9. Does the system or any of its components operate above 10kV? (i.e., generate X-rays) |
10. Does this system use or generate radio frequency (Rf) or microwave (MW) radiation? |
11. Does this system use or contain any laser devices? |
12. Does this system use or generate any non-ionizing radiation (e.g., UV/IR/visible light lamps, plasma chamber view ports)? |
13. Does the system use, contain, or generate any static magnetic fields (e.g., linear motors, or permanent magnets)? |
14. Does this system consist of or incorporate any robot devices (i.e., programmable multiaxis robot arms)? |
15. Has this equipment, or previous models of this equipment been evaluated for safety (including SEMI S2 analysis)? |
If yes, explain:
|
16. Will Installation, Operations and Maintenance Manuals be available for review? |
17. The equipment evaluation typically requires that the system be operational with all facilities (e.g., power, facility gases (N2, CDA), and exhaust operating during the evaluation and testing. Will the equipment be operational with all facilities including exhaust running? |
Please add any additional information that you feel is pertinent to the evaluation: |
|